Mall of Kattameya is one of the latest projects to be carried out in Cairo, with an area of about 420,000 square meters, and the leasing space of the mall will reach 110,000 square meters.The mall will also include many different shopping centers.
UniScaff used a Cuplock system to pour concrete to height over 8.0m.
Cup-Lock is a flexible and adaptable scaffolding system that can be used to make a wide variety of structures and support vertical loads.